Vietnam ramps up LNG infrastructure with floating regas unit

Vietnam plans to ensure stable gas supply for power generation, including the deployment of an FSRU at Vung Tau between 2026 and 2029

PV GAS chairman of the board of directors, Nguyen Thanh Binh, (right) and PV GAS general director, Pham Van Phong, (middle) present solutions for domestic gas and LNG supply in the southeast region through 2030.
PV GAS chairman of the board of directors, Nguyen Thanh Binh, (right) and PV GAS general director, Pham Van Phong, (middle) present solutions for domestic gas and LNG supply in the southeast region through 2030.Photo: PV GAS