</p><p /><p >The Norwegian company, which is merging with BP Norge, said in a Facebook post on Tuesday that the facility was installed on Monday, with Module M00 lifted from the Cosco-owned vessel Xiang Rui Kou early in the morning about 500 metres from the jacket.</p><p >The Sapiem 7000 then moved to the jacket with the module suspended from the crane hooks and lowered the module into place.</p><p