Yinson closing in on Petrobras pre-salt floater deal off Brazil

Malaysian contractor set to use same suppliers that received letter of intent for Pecan FPSO before it was cancelled

Contract: the flotel CSS Olympia is connected to Petrobras' P-58 FPSO in the Parque das Baleias field in the Campos basin
Contract: the flotel CSS Olympia is connected to Petrobras' P-58 FPSO in the Parque das Baleias field in the Campos basinPhoto: GRANENERGIA
Published 21 July 2020, 15:13Updated 22 July 2020, 08:28